
Trevor and Adrian continue cutting to length and attaching cladding to the sides of the tub-boat. By the end of the day the claldding is 2 boards high on either side. Despite pre-drilling the holes, driving the galvanized nails through the boards into the Oak ribs proves very difficult and requires applying considerably ‘welly’ with a very large hammer.

